HTC A05 User Manual Page 103

  • Download
  • Add to my manuals
  • Print
  • Page
    / 109
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 102
6/30/2008 2:31:32 PM
Doc. No. DOC-00040624
REV.
Issued Date 2008/4/14
.
Revised Date 2008/6/23
A05
Doc. Title
Diamond Service Manual
Page 103 of 109
HTC CONFIDENTIAL
SM-TP001-0704
HTC Corporation
9.2 Board Level 2.5 Repairs
Basic Repair Instructions for Component Replacement:
Step 1 Place the solder-proof tape to cover the surrounding area of the components which being replaced.
WarningDO NOT overheat the tape and components to avoid the tape melted and the components damaged
Step 2 Use Heater Gun (HAKO850B, set the temperature between 350°C, Air Speed 3~5) to remove the
components.
Step 3 Wait till the temperature cool do
wn before removing the solder-proof tape to avoid other components
being removed
Step 4 After the damaged or defective components have been replaced; clear the surroundings for solder
and flux re
sidues.
Notice:
A. Checking the polarity of CON8, and the position can't be shifted.
B. Checking the polarity of SW8S
W7, and it can't be reversed.
C. All the parts of the PCB should be checked if it is missing or not.
D. The OP must to wear antistatic wrist band .Don't put b
oards together and avoid hitting them.
E. When you solder and repair that the solderin
g iron, temperature must be setup 415 . (The
temperature range is 415 ±5 ),℃℃ and the solder wire's diameter is 0.4/0.5/0.6mm (SAC 305 (1.1%)
F. Please be noticed to follow below steps for main board repair which is equipped with Golden
Cap
acitor:
1. When replacing level 2.5 components located around the golden capacitor:
I.
The temperature of the hot air blower must be under 400°c
II.
When apply the hot air to the part / component, the heating time must be under 20
se
conds (including the time of removing and soldering)
III. The temperature of the soldering iron must be under 350°c
IV.
When apply the solder tip to the part / component, the heating time must be under 5
se
conds
V. The solder tip must not contact with the golden capacitor
2. For BGA replacement: The golden capacitor must be removed before perform pre-heating,
heating, sold
ering and de-soldering process, and then it must be replaced with a new one
(please refer to 1.c. and 1.d. steps)
3. For main board which failed to pass the function test, the golden capacitor must be replaced
with a new one and must follow below soldering criteria: The temperature of the soldering iron
must be under 350°c When apply the solder tip to the part / component, the heating time must
be under 5 seconds The solder tip must not have a contact with the body of golden capacitor
Page view 102
1 2 ... 98 99 100 101 102 103 104 105 106 107 108 109

Comments to this Manuals

No comments